Home  |  Products  |  Support  |  About us     Contact | Site map | Chinese
 
Technical Support
VRLA Battery FAQ
Battery Installation
Battery Terminal
Maintenance
MSDS
Standards/Approvaled
 
Download
Technical Manual

 

 
  Location here: Home / Support / FAQ
 
Battery installation  
The paralleled cells of VISION battery can be installed on the wood or steel stacks, but it is better to install on the special stacks.

There is no technical reason for limiting the number of strings but for practical installation reasons. It is recommended not allowed to exceed 3 strings in parallel especially if the battery is used in high discharge rates(backup time less than 15 mins)
   
 

 

 

 

Home | Products | Support | About us | Contact | Sitemap | Chinese
© 2006 VISION Group, All Rights Reserved.
Center Power Industrial Park, Tongfu Industrial District Dapeng Town, 518120 Shenzhen, China
Tel:+86-755-8431 8088 Fax:+86-755-8431 8038 E-mail: Sales@vision-batt.com
 
 
Products Search
Advanced Search
 
 
HP&HF Series
FMX Series
CTA Series
CP Series
FM Series
CL Series
CT Series
Deep Cycle Series
CG Series
CG-A Series